SERVICES / STRUCTURAL DRYING
Structural drying
Extraction is the easy half. Getting framing, sub-floor and cavity air back below dry standard is what actually stops mold, and what a carrier pays for only when you can prove it happened.
PHOTO — AIR MOVERS AND LGR DEHUMIDIFIER RUNNING · 620×420
What’s included
Psychrometric baseline
Temperature, humidity and grain depression recorded inside, outside and in affected air.
Equipment sized to the load
Air movers and LGR dehumidifiers calculated to the space, not guessed by room count.
Cavity and hardwood systems
Mat and wall systems dry floors and cavities without unnecessary demolition.
Daily monitoring
Same techs, same meters, readings logged until materials match dry standard.
How it goes
01
Baseline
Readings taken on every affected material and on the outside air.
02
Plan
Written drying plan with equipment count, targets and a dry-by date.
03
Monitor
Daily visits, readings logged and sent to you and your adjuster.
04
Sign off
Equipment pulled only when materials hit dry standard, not on a schedule.
Common questions
Typically three to five days. Dense materials like hardwood and plaster take longer. We pull equipment on readings, never on a fixed schedule.
Live answer, 24/7
(786) 702-2090A person picks up any hour, any day — Miami-Dade, Broward and Palm Beach.
Request a crewCredentials
EPA 608 CertifiedOSHA 1060+ years of experienceFully insured
Standing in water right now?(786) 702-2090